论文部分内容阅读
随着我国国民经济的不断增长,国民需求和社会发展也在不断变化,而此时我国高速公路的建设也受到高度重视。这是一项高规模投资,工程量极大的建设项目,与国计民生紧密相连。但在我国高速公路建设得以快速发展的过程中,高速公路机电工程项目在作为高速公路重要基础设施中却难以受到重视,导致在建设过程中财务管理体系得不到相应保障,资金大量浪费、周转不上和技术滞后等现象。本文通过对目前成本控制管理现状及问题进行分析,试图提供一些利于成本控制管理的方法。
With the continuous growth of our national economy, the national needs and social development are constantly changing. At this time, the construction of our country’s expressways is also highly valued. This is a high-scale investment, construction projects of great volume, closely linked with the national economy and the people’s livelihood. However, during the rapid development of expressway construction in our country, the project of expressway electromechanical engineering is hard to be taken seriously as an important infrastructure of expressway, which leads to the lack of corresponding guarantee of financial management system during construction and the huge waste of funds and turnover Not on the phenomenon of lag and technology. In this paper, the current status and problems of cost control and management are analyzed, trying to provide some methods to control cost control.