论文部分内容阅读
宁波市镇海区骆驼镇沼气集中供气工程是宁波市科委下达的星火计划项目,日前由市科委主持通过验收。 该工程以骆驼镇万头猪场为沼气发酵原料基地,于1990年11月建成日产1200m~3的沼气集中供气工程,供骆驼镇1000余户居民和镇海注射器厂生产使用。沼气工程建有较完善的预处理、厌氧消化、发酵液后处理、沼气净化等设施,工艺先进,设计合理,采用无机械设备加压的5000m长距离输气管和三个贮气柜,满足了输气压力的需要,属省内首创。经过四年多的运行,建立了严格的科
The biogas centralized gas supply project in Camel Town, Zhenhai District, Ningbo City is a Spark program project issued by the Ningbo Municipal Science and Technology Commission. It was presided over by the Municipal Science and Technology Commission. The project uses Wanchang pig farm in Camel Town as the biogas fermentation raw material base. In November 1990, it built a biogas centralized gas supply project with a daily production capacity of 1200m~3, which is used for the production and use of over 1000 households in the camel town and the Zhenhai injector plant. The biogas project has well-established facilities for pretreatment, anaerobic digestion, post-processing of fermentation broth, biogas purification, etc. The technology is advanced and the design is reasonable. The 5000m long-distance gas pipeline and three gas storage tanks that are not pressurized by mechanical equipment are used to meet the requirements. The need for gas transmission pressure was the first in the province. After more than four years of operation, a strict section was established