官厅水库是解放后在多沙河道上建成的第一座大型水库。随着我国国民经济的发展,将在更多类似的河道上兴建大型水利枢纽以控制水流。由于水库的泥沙淤积和泥沙在水库中运行情况,对水库的管理运用和规划设计有极重大的意义,因此在官厅水库建成后卽组织了泥沙测验工作。在官厅水库逐步开展各项测验工作的目的,是搜集原始资料,以便研究水量及泥沙平衡的计算方法,从而为合理地管理运用提供根据。观测成果亦可供其他水库的规划设计作为参考。
Guanting Reservoir is the first large-scale reservoir built on the Dousha River after liberation. With the development of our national economy, large-scale water control hubs will be built on more similar rivers to control water flow. Due to the sedimentation of the reservoir and the operation of the sediment in the reservoir, it is of great significance to the management and planning and design of the reservoir. After the completion of the Guanting Reservoir, the sediment test was organized. The purpose of gradually carrying out the tests in the Guanting Reservoir is to collect the original data so as to study the calculation methods of water balance and sediment balance so as to provide a basis for the rational management and operation. The observations can also be used as a reference for the planning and design of other reservoirs.