为有效控制铁路建设工程质量,进一步提高建设管理水平,确保工程建成后安全、稳定运行,特制定本暂行办法。第一条本办法适用于铁路大中型建设项目的施工和监理招标。小型建设项目可参照执行。第二条铁路建设项目施工和监理招标时,招标人应将部建设行政主管部门公布的工程质量情况作为招标评标时的评审依据。对有关责任单位,在评标时按问题性质扣分或在一定时期内不允许其参与投标。
In order to effectively control the quality of railway construction projects, further improve the management level of construction and ensure the safe and stable operation after the completion of the project, this Interim Measures is specially formulated. Article 1 This set of measures is applicable to construction and supervision bidding of large and medium-sized railway construction projects. Small construction projects can be implemented by reference. Article 2 When bidding for the construction and supervision of railway construction projects, the tenderee shall take the quality of the construction promulgated by the department in charge of construction administration as the basis for judging the bid invitation and bid evaluation. Responsible units, according to the nature of the issue during the evaluation or not allowed to participate in a certain period of bidding.