论文部分内容阅读
被誉为“江南第一索”的南岳索道,1995年11月开通于五岳独秀的南岳衡山。它似一条灿烂夺目的彩练凌空飞舞于高山深壑,将南岳衡山打扮得更加壮美。南岳索道由南岳区人民政府、湖南省旅游开发总公司、香港立华投资有限公司、中国旅游商贸服务总公司、马来西亚华联集团合资兴建,中外合资南岳索道运输有限公司负责建设和运营。工程总投资3200万元人民币,它是采取双承载、双牵引、往复式、封闭吊厢的大型旅游索道。索道下站设于半山亭,上站设于南天门,中间设有两个支架,索道全长1710.8米,上下高差472米,离地面最大垂直高度147米,双向客运量为1000人/小时,运行一次最快只需5分钟,索道全部采用计算机系统进行全面监控和管理。它一下子把半山亭至南天门的崎岖山路
The Nanyue cableway, known as “the first cable in the south of the Yangtze River,” opened in November 1995 in Hengshan, Nanyue. It seems like a splendid painterly volley dances in the deep mountains, dressing Nanxue Hengshan even more magnificent. Nanyue Cableway is jointly constructed by the Nanyue District People’s Government, Hunan Provincial Tourism Development Corporation, Hong Kong Lihua Investment Co., Ltd., China Tourism Business Services Corporation, and Malaysia Hualian Group. The Sino-foreign joint venture Nanyue Cableway Transportation Co., Ltd. is responsible for the construction and operation. The total investment of the project is 32 million yuan. It is a large-scale tourism ropeway with dual-bearing, double-traction, reciprocating, closed cabins. The ropeway station is located at Banshan Pavilion. The station is located at Nantianmen. There are two stands in the middle. The length of the ropeway is 1710.8 meters. The height difference is 472 meters above and below the ground. The maximum vertical height from the ground is 147 meters. The two-way passenger traffic is 1,000 people per hour. It takes only 5 minutes to run it once. The cableway is fully monitored and managed by the computer system. It suddenly put Banshan Pavilion to the rugged mountain road of Nantianmen