论文部分内容阅读
水利水电规划设计总院对江西省水利规划设计院编制的《南昌市昌南城区防洪工程可行性研究报告》(包括修订稿 )进行了审查。审查认为 ,该可研报告是设计单位在业经长委审查 ,并由江西省政府批复的《南昌市城市防洪规划报告》的基础上 ,作了大量工作及方案比较后提出的 ,技术方案
Water Resources and Hydropower Planning and Design Institute of Jiangxi Province Water Resources Planning and Design Institute prepared “Nanchang Changnan City Flood Control Project feasibility study report” (including the revised draft) were reviewed. The review concluded that the feasibility study report was made on the basis of the “Nanchang Urban Flood Control Planning Report” reviewed and approved by the Jiangxi Provincial Government and approved by the Jiangxi Provincial Government. The feasibility study report was made after a large amount of work and comparison of plans were made. The technical proposal