论文部分内容阅读
151107工作面是新集一矿第一个装备大功率综采设备的工作面,其采煤机最大落煤能力2 000t/h,根据一矿运输系统的实际情况,该面机巷带式输送机输送能力选用1 000 t/h,原设计机巷安设2台SSJ1200/2×200伸缩式带式输送机,运输联巷安设1台SGZ830/2×400刮板机,11煤胶带运输上山输送倾角为130°-0°-14°,须安设下运带式输送机。1 优化与改造1.1 机巷带式输送机的优化机巷全长1 280 m,输送平均倾角为-2.5°,为缓倾角输送,原设计安设2台 SSJ1200/2×200伸缩式带
151107 Face is the first coal mine equipped with high-power fully mechanized mining equipment in Xinji No. 1 Mine. Its maximum coal fall-out capacity is 2 000 t / h. According to the actual situation of the mine transport system, Machine conveyor capacity of 1 000 t / h, the original design Lane 2 sets of SSJ1200 / 2 × 200 telescopic belt conveyor, transportation Lane installation of a SGZ830 / 2 × 400 scraper, 11 coal tape transport Uphill transport angle of 130 ° -0 ° -14 °, to be installed under the belt conveyor. 1 Optimization and Renovation 1.1 Optimization of Laneway Belt Conveyor The lane has an overall length of 1,280m and an average conveying angle of -2.5 °. It is designed for gentle inclination transportation and originally designed and installed two SSJ1200 / 2 × 200 retractable belts