华东电网现有装机容量 4872 0 MW,其中60 0 MW机组 8台 ;30 0 ( 350 ) MW机组 53台 ;2 0 0 MW机组 1 9台。华东 50 0 k V电网自 1 986年底第一回投运以来 ,现已拥有 50 0 k V变电站 2 3座。交流 50 0 k V线路 38回 ,总长 3744.2 km,直流葛洲坝—上海± 50 0 k V线路 566.37km。
East China Power Grid has an installed capacity of 4872 0 MW, of which 60 units of 60 MW units, 30 units of 30 MW (350 ) MW units and 19 units of 200 MW units. Since East China 500 kV power grid was put into operation from the first time at the end of 1896, it now has 23 substations of 50 kV. The exchange 50 0 kV line 38 times, the total length of 3744.2 km, DC Gezhou Dam - Shanghai ± 50 0 kV line 566.37km.