1997年以前,腾冲县的电力事业还比较落后,腾冲县电力公司装机容量仅12950KW,担负县16个乡镇的供电任务,从1990年开始,已出现缺电状况,严重时,直接影响到了工农业生产。腾冲县电力公司从1992年12月筹建了龙江二级电站——2万KW,经多方努力终于在1997年3月建成发电,对腾冲县的电力改善做出了极大的贡献,并且已有1万余度的剩余电,到现在,已拥
Before 1997, Tengchong County’s electric power business was still relatively backward. The installed capacity of Tengchong County Electric Power Company was only 12950 KW, and it was responsible for the power supply task of the 16 townships in the county. Since 1990, power shortages have occurred. When it was serious, it directly affected the agricultural and industrial sectors. produce. Tengchong County Electric Power Co., Ltd. established the Longjiang second-stage power station, which was 20,000 KW in December 1992, and finally completed power generation in March 1997 through various efforts. It has made great contributions to the improvement of power in Tengchong County, and it has There are more than 10,000 surplus electricity, and now we have