商丘供电公司结合国家电网公司“三集五大”体系建设,以全员全过程管理的主要流程为主线,不断提升生产管理水平,开展了电网运行可靠性提升“五协同”专项行动,即电网运行方式、基本建设项目、技术进步与技术改造项目、停电检修计划与物资材料协同进行。通过制定评价准则、建立管理制度、推行目标管理、加强过程管控、进行诊断分析、开展人员培训、实施评价与考核等内容,逐步完善建设、改造、运行、检修、物资工作协同机制,并积极应对电厂缺煤停机、外力破坏、恶劣天气等对电网运行的影响,动态调整检修计划,优化停电检修方式,确保了商丘电网安全可靠和稳定运行。
Shangqiu power supply company with the State Grid Corporation “three sets of five ” system building, the whole process of the whole process of the main flow of the main line, and constantly improve the level of production management, to carry out the reliability of the grid operation “five coordination ” special action , Namely the grid operation mode, the capital construction project, the technical progress and the technical transformation project, the power outage maintenance plan and the materials and materials cooperated. Through the establishment of evaluation criteria, the establishment of management system, the implementation of goal management, process control, diagnosis and analysis, personnel training, the implementation of evaluation and assessment content, and gradually improve the construction, renovation, operation, maintenance, supplies work synergies and actively respond Power plant shutdown of coal shortage, external damage, adverse weather, such as the impact on power grid operation, dynamic adjustment of maintenance plans to optimize the power outage maintenance methods to ensure safe, reliable and stable operation of Shangqiu power grid.