被市政府列为上海第二批十大工程之一的成都路高架道路工程已付诸实施,今年7月开工。1994年完成高架道路,1995年建成地面道路。成都路是市区目前最中心、最重要的南北干道,但原有道路仅宽10余米,最狭处不足10米,道路弯道较多,整体线型较差。在北京路以北路段,机动车难以通行,以致大量车辆只能绕道西藏路、石门路,造成市区道路严重阻塞。所以拓宽成都路,建造高架道
Chengdu City, as the second batch of ten projects by the municipal government elevated road project in Chengdu has been put into operation, started in July this year. Elevated roads were completed in 1994 and ground roads were completed in 1995. Chengdu Road is the most central and most important north-south trunk road in the urban area. However, the original road is only 10 meters wide and the narrowest is less than 10 meters. There are many road corners and the overall line type is rather poor. In the north section of Beijing Road, motor vehicles are difficult to access. As a result, a large number of vehicles can only bypass Tibet Road and Shimen Road, causing serious congestion in urban areas. So broaden Chengdu Road, build elevated road