论文部分内容阅读
在水利发电中,水轮发电机为较为基础的一种设备,运行的原理为借助于水轮机的带动作用,实现水能向电能的转化,所以,水电站运行情况的好坏是和水轮发电机质量的高低直接有关系的,其中,安装质量又决定了水轮发电机组的质量,因此,对水轮机组的安装质量进行研究具有重要的意义。本文首先简要介绍了水轮发电机组的相关安装环节,接着概述了各项工艺对质量方面的要求,最后对安装水轮发电机组时的质量控制要点进行了探讨,希望能为相关的行业以及工作人员提供一点参考。
Hydroelectric power generation, hydroelectric generator is a more basic kind of equipment, the principle of operation is driven by the turbine to realize the conversion of water energy to electricity, so the operation of the hydropower station is good or bad and the hydroelectric generator The level of quality is directly related to the installation quality, which determines the quality of hydro-generator sets, therefore, the study on the quality of turbine installation is of great significance. This article first briefly introduces the related aspects of the installation of hydro-generator sets, then summarizes the various aspects of the quality requirements of the process, and finally the installation of hydro-generator sets of quality control points were discussed in the hope that for the relevant industries and work Staff to provide a little reference.