黄河沙坡头水利枢纽工程是国家实施西部大开发的一项标志性工程,主要建设目的是灌溉和发电,总控制灌溉面积为893万hm2,水库总库容2600万m3,总装机容量1204万kW,建设工期为45个月,计划总投资128亿元.自2000年12月开工建设以来,沙坡头水利
The Shapotou Water Control Project of the Yellow River is a landmark project for the implementation of the Western Development of China. The main purpose of the project is irrigation and power generation. The total control irrigated area is 8.93 million hm2, the total reservoir capacity is 26 million m3, and the total installed capacity is 12.04 million kW. The construction period is 45 months and the planned total investment is 12.8 billion yuan. Since the start of construction in December 2000, Shapotou water conservancy