清江隔河岩水电站水轮发电机组的选型工作,早在七十年代便已着手进行,随着工作的逐步深化,对整个枢纽的水能综合利用指标、正常高水位,电站装机容量等主要参数,都作了较为充分的论证,特别是经过一九八二年七月水电部主持召开的清江隔河岩水利枢纽补充初步设计审查会后,进一步考虑了隔河岩电站与葛洲坝电站补偿调节运
As early as the seventies, the selection of hydrogenerator units at Qinghe Geheyan Hydropower Station has been carried out. With the gradual deepening of the work, the key indicators of comprehensive utilization of hydropower, normal high water level, installed capacity of power stations, etc., of the entire hub, Parameters, have made a more full argument, especially after the Hydropower Department in July 1982 under the auspices of the Qingjiang Geheyan water conservancy hub supplementary preliminary design review meeting, further considered Geheba Gezhouba hydropower station compensation and adjustment Shipped