论文部分内容阅读
潘庄引黄总干渠自潘庄始尚庙止,全长91.3km,总干渠止设有8个水沙测量站,两岸的13座干渠进水闸和82座干渠支进水闸负责向齐河、禹城、平原三县(市)供水,控制灌溉面积14.1万hm~2。潘庄引黄灌溉管理处具体负责总干渠的工程管理和输水管理,由尚庙闸进入马颊河的水,具体由德州市水利局河道管理处统一调配。 1 测水量水现状 总干渠上现有的8个水沙测量站,始建于1981
The total length of Panzhuang Yellow River Diversion Route from Panzhuangshi Temple is 91.3km. There are 8 water and sediment measurement stations along the main canal, 13 main channel intakes and 82 main channel support sluices on both banks are responsible for Qihe, Yucheng, plain three counties (cities) water supply, control irrigation area of 141,000 hm ~ 2. Panzhuang Yellow River Irrigation Management Office is in charge of the project management and water management of the main trunk canal specifically. Water from the Shangmiao Gate into Majia River is allocated by the River Management Office of Dezhou Water Conservancy Bureau. A water measurement of the status quo The main trunk canal existing 8 water and sediment measurement station, was founded in 1981