论文部分内容阅读
广东大亚湾核电站水工部份的科研任务经过一年时间的辛勤研究,已基本结束,并于1987年9月底在河海大学对研究的主要成果——广东核电站(微)排放数学模型与物理模型通过了评审。来自国内的有关著名专家经过两天评审,一致认为:河海大学能够在较短的时间内高效率地完成两种模型研究是校领导最视,课题组全体人员辛勤努力以及兄弟单位大力支持的结果。两种模型研究成果分别具有下述特点:
After one year of hard research, the research task of Guangdong Daya Bay Nuclear Power Station hydraulic engineering has been basically ended. At the end of September 1987, the key achievements of the study - the mathematical model and physical model Passed the review. After two days’ accreditation, renowned experts from China agreed that: Hohai University should be able to complete the two models efficiently in a relatively short period of time with the most attention from the school leaders, the hard work of all the staff in the research group and the strong support from the fraternal units result. The results of the two models have the following characteristics respectively: