由广州市建三公司第二总承包部承建、茂名二建施工的广州泰康城广场,是一幢占地面积4000多平方米,共40层(包括两层地下室),楼高达130米的商住楼宇。自1994年正式动工以来,便采用硬地法施工方案,以其高速优质、良好的服务态度深受上级部门和建设单位好评。目前,该广场施工进度已完成十一层转换层,进入标准层后计划以月上四层的速程,力争确保1996年9月顺利封顶。 该工程从一开始,第二承包部便十分明
Guangzhou Taikang City Plaza, built by the second general contracting department of Guangzhou Jiansan Co., Ltd. and constructed in Maoming No. 2 Building, is a plaza covering an area of 4,000 square meters and a total of 40 floors (including two basements) with a height of 130 meters. Housing. Since the formal start of construction in 1994, it has adopted a hard-land construction plan, and its high-speed, high-quality, and good service attitude have been well received by superior departments and construction units. At present, the construction progress of the square has been completed with 11 layers of transition. After entering the standard layer, it plans to use the upper four-month speed, and strives to ensure smooth capping in September 1996. From the outset, the second contracting department was very clear