新形势下对加强施工项目材料管理工作的思考

来源 :建筑知识 | 被引量 : 0次 | 上传用户:maomao1983520
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
项目材料在整个建筑工程中的直接费用成本比例通常都高达50%以上,部分项目甚至会达到65%左右,其是整个建筑工程的关键生产要素,项目材料管理工作好坏直接关系到整个建筑工程的效益。因此,加强施工项目材料管理就成为整个建筑工程中至关重要的内容。鉴于此,本文基于新形势下我国施工项目实际情况,提出几点加强项目材料管理的措施,仅供参考与借鉴。 Project materials in the entire construction cost of the direct cost are usually as high as 50% or more, some projects even reach about 65%, which is the key production factor of the entire construction project, the project material management is directly related to the quality of the entire construction project Benefit. Therefore, to strengthen the construction project material management has become the crucial part of the entire construction project. In view of this, this article based on the actual situation of China’s construction projects under the new situation, put forward some measures to strengthen project materials management, for reference and reference.
其他文献
阅读下面的文字,根据要求作文。(60分)母语是一个人最初学会的一种语言。人人都有自己的母语。母语是民族文化的载体,是民族生存发展之根。在当今世界多元文化竞争与交汇的时
“作文QQ堂”开课啦!你一定会奇怪,为什么我们的作文课要带上QQ?在QQ堂里转一圈,你就会发现,这里的师生交流没有距离,作文学习充满乐趣和发现,原来作文也可以Q起来! You wil
请下载后查看,本文暂不支持在线获取查看简介。 Please download to view, this article does not support online access to view profile.
期刊
2003年3月的一个晚上,妈妈的一个朋友来到我家,让妈妈和她一起去外地做生意,说能赚大钱。妈妈信以为真,便辞去了厂里的工作,去了江苏某地。那时候,我刚上一年级,姐姐读初三。
现在,学校开设的课程多了,小学生背的书多,书包自然就重了。正处在长身体阶段的我们被大书包压得直不起腰,个子也都长不高了。看到这种情形,我突发奇想:“能不能发明一本书,
采用CO/CO2-含V2O5炉渣的气渣间化学平衡方法研究了在1783K和1843K下CaO-SiO2-Al2O3-MgO-V2O5炉渣中钒氧化物VOx的非化学计量性。结果表明:VOx中的x随lgpo2呈现线性增加;碱度的增
1.调整位置 1.1将球镜及散光度数归零 1.2设定瞳距:让患者平视前方,检查者面对患者,使辅助镜片中十字中心对准患者瞳孔中心。 1.3调整被检查者与综合验光仪之间的位置。 1.4
中秋的月亮真圆,像是一张银色的唱片。唱片唱的是什么歌呀?唱的是和平、幸福,万家团圆。中秋的月亮真圆,像是一面亮亮的镜(jing)子,瞧(qiáo),那个镜子里,是不是有水,是不是
昨晚上看的早上,六楼的老张看到了五楼的邻居老李,作为球迷,老张一见面就兴奋地问老李:“哥们,昨天晚上看球了吗,德国对哥斯达黎加的那场?”“没看,但 Looked up last night
东莞汇商物流园新建项目工程地面面积82000m2,采用非金属耐磨材料直接撒布在结构板新鲜混凝土上,整体浇筑成型的地面,通过控制混凝土坍落度和导轨标高来控制地坪的平整度,确
期刊