简单介绍乐滩水电站Ⅱ标溢流坝碾压混凝土的施工,合理选用拌和设备和浇筑设备,有效地解决溢流坝碾压混凝土施工强度大的难题。
This paper briefly introduces the construction of Grade R Overflow Dam RCC at Letan Hydropower Station. The reasonable selection of mixing equipment and pouring equipment can effectively solve the problem of large construction intensity of RCC dam.