论文部分内容阅读
石庄头灰场水力设计包括放灰、排水和调洪计算,求得的各项指标,尤其是不同高程放灰沉积速度和贮灰时间的关系、澄清区长度和环保要求的关系与有干滩调洪和防洪要求的关系等为运行技术管理所必须,对于后期灰坝稳定和抗震措施也有密切关系。本文阐述的水力设计方法,较大部分是在设计实践中逐渐揭示和形成的新方法。
The hydraulic design of Shizhuang first ash yard includes the calculation of ash discharge, drainage and flood control, and the obtained indexes, especially the relationship between the sedimentation speed and the storage time of ash in different elevation, the relationship between the length of clarification area and environmental protection requirements Flood control and flood control requirements of the river for the operation and management of technology necessary for the post-dam stability and seismic measures are also closely related. The hydraulic design method described in this article, the greater part is gradually revealed and formed in the design practice of new methods.