阎王鼻子水库工程干1996年1O月开工,在基础开挖过程中发现在句2坝段存在岩石破碎带,并且规模较大,命名见断层,其规模及地质状况在初设过程中并没有论述,说明在开挖过程中地质情况有所变化.为了施工的需要,必须针对具体情况,提出处理方案.1破碎带的工程地质条件1.1地?
Yan Wang nose reservoir project started in January 1998 1996, found in the excavation process found in the sentence 2 dam section of rock fracture zone, and the larger, named fault, the size and geological conditions in the initial set up process and not discussed , Indicating that the geological conditions have changed during excavation. In order to meet the needs of the construction, we must put forward the solution according to the specific situation. 1 broken belt engineering geological conditions 1.1 to?