论文部分内容阅读
冬季施工由于施工条件及环境不利,是工程质量事故的多发季节,尤以砼工程居多,冬季施工质量事故容易出现隐蔽性、滞后性,即工程是冬天干的,大多数在春季才开始暴露出来,因而给事故处理带来很大的难度,轻者进行修补,重者重来,不仅给工程带来损失,而且影响工程的使用寿命,现就冬期施工前及施工过程注意的问题进行探讨。
Winter construction due to poor construction conditions and the environment is the season of engineering quality accidents, especially in the majority of concrete construction, winter construction quality accidents prone to concealment, lag, that is, the project is dry in winter, most began to be exposed in the spring Therefore, it is very difficult for the accident handling. The lesser are repaired. In the event of heavy losses, the project not only brings losses to the project, but also affects the service life of the project. The problems before and during construction in winter are discussed.