平畴绿野、村落棋布的葛店镇处处充满着生机和活力,横亘东西的母亲河长江,在镇西兀立的白浒山脚下拐个九十度的大弯,北折而东流,滋润着这块空灵丰饶的土地,湖北能源集团鄂州电厂三期百万机组扩建工程就坐落于此。每天清晨,无论风雨,总能看到一个消瘦的身影,戴着醒目的安全帽,穿着深黑色的工作服,走进如火如荼的施工现场,一处处仔细巡查,巡查完毕,他习惯性地爬到主厂房的高处,听着远处的机器轰鸣,他的眼中充满了热望,像
Pingcun green field, the village chess Ge Dianzhen everywhere full of vitality and vitality, across the mother river of things Yangtze River in the west of the White Hu Shan at the foot of a 90 turn a big bend, the North fold and east flow, moisten with This piece of ethereal fertile land, Hubei Energy Group Ezhou Power Plant three million units to expand the project is located here. Every morning, regardless of the wind and rain, always can see a thin figure, wearing eye-catching hard hat, wearing dark black overalls, walked into the construction site in full swing, a careful inspection everywhere, patrols completed, he habitually climbed the Lord The height of the factory, listening to roar of machines in the distance, his eyes full of hope, like