论文部分内容阅读
文章介绍了导流洞洞室在开挖施工中制定合理的施工方案,配备合理的施工机械,采用先进的技术措施,加快了施工进度,保证了开挖质量和工期。
This paper introduces the construction of diversion tunnel in the excavation of a reasonable construction program, equipped with a reasonable construction machinery, the use of advanced technical measures to speed up the construction schedule to ensure the quality and duration of excavation.