主要介绍了试制 1 7.5 t、2 0 t大钢锭过程中钢锭模及附件设计参数的选取、设计计算方法、生产工艺参数的确定 ,以及克服行车提吊能力不足限制所采取的措施。
This paper mainly introduces the selection of design parameters, design and calculation methods, the determination of production process parameters and the measures taken to overcome the limitation of driving hoisting capacity in trial production of 7.5 t and 20 t large ingots.