论文部分内容阅读
随着大规模经济建设迅速发展,灌注桩基础工程施工发展十分迅速。吉林省地矿局已有3~4个单位施工了工程建筑厂房、楼基、烟囱、地下商场、引桥等灌注桩基础。两年多来共施312000余个灌注桩,工作量两万多米。其中1986年为第一汽车制造厂锻压车间施工12500t水压机基础工程,经测试完全满足设计质量标准。综上所述,我省重点工程建筑灌注桩施工和城市高层建筑灌注桩基础施工收到了较好的社会经济效益。
With the rapid development of large-scale economic construction, foundation construction of cast-in-situ pile has developed rapidly. Jilin Province Bureau of Geology and Mineral Resources has 3 to 4 units of the construction of the engineering construction plant, building, chimney, underground shopping malls, such as piles of diversion pile foundation. In more than two years, more than 312,000 bored piles have been put together and the workload is more than 20,000 meters. One of 1986 for the first automobile factory forging workshop construction 12500t hydraulic foundation engineering, the test fully meet the design quality standards. In summary, the key construction projects in our province bored pile construction and urban high-rise building bored pile foundation construction has received good social and economic benefits.