中国水力发电工程学会水工水力学专委会和我院于1988年12月13日至19日在成都联合召开了“二滩水电站泄洪消能专题研讨会”。与会专家、教授和代表共72人,分别来自全国高等院校、科研机构和设计院共24个单位。提交会议交流的论文和报告共34篇,有18位代表在大会上介绍了研究成果,并分组进行了讨论。二滩双曲拱坝高240m,校核泄量23900m~3/s,相应泄洪功率达2700万kW,在世界上名列前茅。泄洪消能难度大,这一问题的解决将具有国际先进水平,也是国家“七五”科技
China Hydropower Engineering Society Hydraulics Hydraulics Committee and our hospital in December 1988 December 13 to 19 in Chengdu jointly held “Ertan Hydropower Station flood discharge energy-saving seminar.” A total of 72 participating experts, professors and representatives came from 24 institutions of higher learning, research institutes and design institutes all over the country. A total of 34 papers and reports were submitted to the conference for exchange, 18 of them presented the research results in the conference and discussed in groups. Ertan double curvature arch dam 240m high, check the amount of 23900m ~ 3 / s, the corresponding flood discharge power of 27000000 kW, among the best in the world. Difficult to flood discharge energy, the solution to this problem will have the international advanced level, but also the country “seven five” technology