建设能够激励创新和创业的体制机制

来源 :新金融 | 被引量 : 0次 | 上传用户:tcskater
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
中国经济现在面临着很复杂的局面,沿用需求侧因素的诸如强刺激等经济政策,带来了包括投资报酬递减、债务积累等问题,而且促进经济增长的效果不明显。在供给侧因素下,可以通过推动劳动力、技术等要素的进步实现经济发展方式的转型,即:依靠经济增长的驱动力从增加投资转向增加索洛余值,而这当中的关键是创建新的体制机制。说易行难,要改革、要创新,面临不少的阻力和障碍,需有足够的政治勇气和智慧来克服阻力和障碍,切实推进改革,建设能够激励创新和创业的体制机制。 The Chinese economy is now facing a very complicated situation. Economic policies such as strong stimulus that follow the demand side have brought about problems such as diminishing returns on investment and debt accumulation. However, the effect of promoting economic growth is not obvious. On the supply side, the transformation of economic development mode can be realized by promoting the improvement of labor force, technology and other factors. That is, relying on the driving force of economic growth to shift from increasing investment to increasing the Solow residual value, the key is to create new Institutional mechanisms. To say that it is easy to reform, to innovate and to face many obstacles and obstacles requires sufficient political courage and wisdom to overcome resistance and obstacles, earnestly push forward reforms and build institutional mechanisms that can stimulate innovation and entrepreneurship.
其他文献
会议
会议
会议
【摘要】工程造价预决算是项目投资、甲乙双方决算以及工程拨款的重要依据,也是后续招投标报价和工程造价确定的重要依据。当前对其进行审核已经成为了造价控制的关键手段,只要充分落实预决算审核,选用适合的审核方法,才可以避免经济效益受损,提升项目投资效益率,实现投资规模的合理把控,达到投资效益最大化。  【关键词】工程造价;预决算;审核方法;建议  【DOI】10.12334/j.issn.1002-853
【摘要】在水电建设项目中,全过程跟踪审计工作的全面开展能够及时发现相关问题,在此基础上逐步地进行整改,使得项目管理水平得到根本性的提升。本文主要分析了水电建设项目全过程跟踪审计存在的相关问题,提出了相应的解决措施。  【关键词】水电建设项目;全过程跟踪审计;问题;对策  【DOI】10.12334/j.issn.1002-8536.2021.  10.199  对水电建设项目进行建设的过程中,全过
以浓盐水为研究对象,选取进料液温度、真空度、进料液流速、超声频率和超声功率5个影响因素,对超声强化减压膜蒸馏工艺中膜通量的影响进行实验研究。实验结果表明:浓盐水超声
2014年我国经济形势复杂、下行压力较大。与此相应,国内学者对现阶段经济增长与发展的新特征、驱动力以及新形势下调控政策的选择等内容进行了大量的研究。相较于之前的研究,
产品的平面展示对于产品的展示尤为重要,因为它能在二维的平面中传达出比三维产品更多的信息。本文从设计版面管理的角度出发就如何较好的整理这些信息,做出一个较好的板式,让产