1工程概况哈尔滨三电厂是国家“八五”时期重点工程,该工程位于松花江北岸呼兰县境内的腰堡段,为确保电厂供水和本身防洪需要,必须加固堤防进行河道整治。电厂的河道二期整治工程,包括以下几个方面:①锁坝加固工程;②锁坝护岸工程;③丁坝工程。施工中采用了纤维布水下沉
1 Project Overview Harbin Power Plant is the national “Eighth Five-Year” period key project, which is located in Hualong County, north shore of the Songhua River in the Fort Yalong section, in order to ensure power plant water supply and flood control needs, we must reinforce the dike for river regulation. The second phase power plant river regulation project, including the following aspects: ① lock dam reinforcement project; ② lock dam bank protection project; ③ dam engineering. Construction using fiber cloth sinking