论文部分内容阅读
红石水电站机组振动诱发了厂坝振动 ,通过现场振动试验、结构动力计算及模型试验 ,实现了振动故障诊断 ,并为进一步的加固处理和消减振动措施的实施提供了重要理论基础。
The vibration of the dam was induced by the vibration of the unit of Hongshi Hydropower Station. Through the on-the-spot vibration test, structural dynamic calculation and model test, the vibration fault diagnosis was realized and provided an important theoretical basis for the further reinforcement and vibration mitigation measures.