1985年作者通过一个月的铜绿山、赤马山、狮子山、铜官山、武山、东乡铜矿及金堆城百花岭、三十亩地选厂等八个尾矿设施生产实践考察学习,结合我矿尾矿设施实际,对我矿选厂尾矿设施投产以来的使用情况进行总结,並对生产中存在:(1)尾矿输送流槽及其加压泵设备问题;(2)尾矿库内的排洪与其回水泵设施问题;(3)尾矿库内1~# 2~#坝的尾矿堆筑子坝的施工方法问题;(4)尾矿库内子坝的排渗设施问题,进行探讨研究.最后,对我矿尾矿设施管理的四个方面提出个人建议与看法。
In 1985, the author studied and studied the production of eight tailings facilities such as Tonglushan, Chimashan, Lion Rock, Tongguan Mountain, Wushan, Dongxiang Copper Mine and Baiyunling Jinduicheng, Combined with the actual mine tailing facilities, the application of tailings facilities in our mine was put into operation. The problems existed in the production are as follows: (1) Tailings conveying runners and their pressure pump equipment problems; (2) Tails (3) The construction methods of tailing heaps of 1 ~ # 2 ~ # dams in tailings ponds; (4) The problems of drainage facilities of tailings dams in tailings ponds , And discussed and discussed.Finally, I put forward my personal suggestions and opinions on the four aspects of mine tailings facilities management.