中国第二大水电站2005年春将开工

来源 :水电厂自动化 | 被引量 : 0次 | 上传用户:ericawanghnu
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
日前,从有关部门获悉,总投资603.3亿元、总工期12年两个月、装机容量1260万 kW 的中国第二大水电站一溪洛渡水电站,将于2005年春正式开工。据了解,溪洛渡电站位于四川雷波(15 km)和云南永善(8 km)县境内的金沙江下游溪洛渡峡谷河段。该电站以发电为主,兼顾防洪、拦沙和改善下游航运条件的巨大综合效益。国家开发的目 Recently, the relevant department was informed that a total investment of 60.33 billion yuan, the total duration of 12 years and two months, an installed capacity of 12600000 kW of China’s second largest hydropower station, a Creek 洛渡 hydropower station, will be officially started in spring 2005. It is understood that the Xiluodu Power Station is located in the Xiluodu Gorge section of the lower Jinsha River in Sichuan Leibo (15 km) and Yunnan Yongshan (8 km). The power plant to generate electricity, taking into account flood control, sand blocking and improving the downstream shipping conditions, a huge comprehensive benefit. National development goals
其他文献
1 十干渠工程概况十干渠工程位于洛阳市吉利区的北部岭区,始建于70年代,是河南省引沁济蟒(水源在山西)的主要通道,设计流量为2.0m~3/s。自从行政区划变更,吉利区从焦作划给
请下载后查看,本文暂不支持在线获取查看简介。认清形势 突出重点 开创经营发展新局面——河北省水利工程局2004年工作展望 Please download to view, this article does n
期刊
本文对大口径灌注桩直立挡墙与加筋土挡墙进行比较,通过结构计算、设计、经济分析,推荐堤防工程中采用加筋土挡墙结构。 In this paper, the comparison between the large-
68岁的王老师是我的老患者,他的冠心病历史已有七八年了,前几年我一直给他治疗,病情比较平稳,后来,我就把他介绍给他们学校的校医,继续维持治疗,已有三四年没再来找我。可最
老年糖尿病人的家庭内保健和治疗,涉及到饮食、运动、精神、药物治疗及日常生活方式等各个方面,需要综合措施来落实,绝不能单纯认为药物治疗就可替代其它方面。因此,老年糖
老年人也可能患红斑狼疮  问:红斑狼疮有些什么表现,老年人是否也会发生,其治疗办法如何 ?郴州 杜文生 答:红斑狼疮是一种比较常见的结缔组织病,又称自身免疫性疾病。正是由于本
为配合深圳市人大三届六次会议的召开,让代表充分行使代表权利,2月15日,宝安区人大常委会组织区的部分市人大代表对北线引水一期工程(龙口至茜坑)进行视察。市人大常委会副
本文介绍虚拟用户交换机(CENTREX)技术特点与功能,结合太浦河泵站工程实际应用分析了 CENTREX 技术在技术经济性上的优点。 This paper introduces the technical features
生产实心粘土砖,不仅大量破坏土地、消耗能源,而且破坏生态、污染环境。因此,禁止生产使用实心粘土砖,推广应用新型墙体材料,对利废、节地、节能和改善建筑功能,以及墙体材
12月6日至8日,第八届海峡两岸水利科技交流研讨会在广州珠江委召开。此次研讨会由中国水利水电科学研究院和台湾大学主办,水 利部珠江水利委员会承办,美华水利学会、广西水利