论文部分内容阅读
如何考虑水轮泵综合利用开发,充分利用水能,合理规划泵站的综合装置,发挥更大的经济效益,获得最佳的经济效果,这是设计和管理泵站人员的共同愿望。可是水轮泵站的水能利用和综合开发仍存在着不少的问题,从泵站的规划开发、设备装置等都没有注意全面的综合考虑,致使泵站的管理遗留不少的问题,尤其是六十年代初期兴建的泵站,由于缺乏规划和设计,泵站的建设是一哄而起,大搞群众运动,工程施工质量差、设备装置不合理,水轮泵选型多为老式,水头比只有4、6等少数几种类型,这样类型的水轮泵不适宜高扬程提
How to consider the comprehensive utilization of hydraulic pump development, make full use of water energy, rational planning pumping station integrated device, to play greater economic benefits, to obtain the best economic results, which is the design and management staff of the common desire. However, there are still many problems in the utilization and comprehensive development of hydro-pumping stations. From the planning and development of pump stations and the installation of equipment, they fail to pay attention to comprehensive and comprehensive consideration, resulting in a lot of problems left over by the management of the pumping stations, Is a pump station built in the early 1960s. Due to lack of planning and design, the construction of pumping stations is one after another. The mass movement, the poor quality of construction facilities, the irrational installation of equipment, the selection of water wheel pumps are mostly old-fashioned, Head than the only 4,6 and a few other types, this type of water pump is not suitable for high-lift mention