论文部分内容阅读
〔译者按)爱知用水工程是日本50年代修建的规模宏大的水利工程。它利用木曾川水系的水资源供给爱知县和歧丰县使用。工程于1955年开工,1961年投入使用。主要工程牧尾水库,总库容7500万m2;东乡调节库(爱知池),总库容900万m2;干渠112.1km,引水最大流量30m3/s;支渠总长
[Translator’s note] Aichi water project is a large-scale water conservancy project built in Japan in the 1950s. It uses the water resources of the Mizusawa River system to supply Aichi Prefecture and Qifeng County. The project started in 1955 and was put into operation in 1961. The main project of Muwei Reservoir, with a total storage capacity of 75 million m2; Dongxiang Regulating Library (Aichi Pool), with a total storage capacity of 9 million m2; trunk canal of 112.1km and diversion maximum flow of 30m3 / s;