潘家口工程用10/30吨门机无栈桥浇筑大坝混凝土的经验

来源 :水力发电 | 被引量 : 0次 | 上传用户:CmMocean
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
一、枢纽工程施工概况潘家口水库枢纽工程主要由拦河大坝和坝后式电站组成(见图1)。大坝为低宽缝重力坝,缝宽8米,最大坝高107.5米(基础高程123.0米,坝顶高程230.5米),坝顶长1,039.11米。沿坝轴线方向设横缝将大坝分成56个坝段,除特殊坝段外,一般长18米。拦河大坝混凝土250万米~3,电站混凝土20万米~3,水库枢纽混凝土总量近300万米~3。该工程于1975年10 I. Overview of Pivotal Project Construction The Panjiakou Reservoir Hub Project is mainly composed of a barrage dam and a dam-type power station (see Figure 1). The dam is a low-width-gap gravity dam with a slit width of 8 meters and a maximum dam height of 107.5 meters (basic elevation 123.0 meters and crest elevation 230.5 meters) with a crest length of 1,039.11 meters. Set along the axis of the dam transverse joints dam will be divided into 56 dam, except for special dam, the general length of 18 meters. Dam concrete 2.5 million meters dam 3, power station concrete 200,000 meters ~ 3, the total amount of concrete reservoir reservoir nearly 3 million meters ~ 3. The project in 1975 10
其他文献
以人为本作为科学发展观的核心,对高职院校的学生管理工作提出了新的要求,这是每一位学生管理工作者必须认真解决和积极实践的迫切任务。四川建院与时俱进的提出“以生为本”
黑龙江省黑河地区地处北纬50度左右,气候严寒,人们每年得同冰雪打六个月交道,长期以来,都把冰雪当作灾害。党的十一届三中全会以后,黑河地区群众解放了思想,振奋起为实现社
南京水利科学研究所技术情报室编辑的《水利水运译丛》将于二季度内出版。该刊选译英、法、德、日、俄各文种有较大参考价值的近期发表的文章,供从事水利水运科技工作者和大
计算机组甩负荷过程中转速升高的最大值,国内、外提出不少近似计算公式。虽然计算方法和表达方式不一样,但全是以机组转动方程式为基础推导出来的,区别只是采用不同的假定条
车身受到损坏时,首先确定变形出现在什么地方。车身一般设计成在前部和后部有能够吸收能量的变形区,因此在这一区域内要有能承力的翻边及有意设置的断面薄弱区,以保证尽可能
葛洲坝水利枢纽第一期工程投入运行的第一年,1981年7月长江上游发生建国以来特大洪峰,入库流量达72,000秒立米,宜昌流量70,800秒立米,相当于一期工程的校核流量71,100秒立米
起诉意见书是公安机关经常使用的一种极其重要的刑事法律文书,它是根据刑事案件侦查结论制作的,具有向同级人民检察院提出起诉意见的作用。《刑事诉讼法》第一百二十九条规定
一般资料:106例患儿中,男性47例,女性59例。年龄最小者2个月,最大者11岁。门诊病人63例,留观病人19例,住院病人24例。病程最短者1小时,最长者5天。观察对象:选择病例均为实证发热。体温在373℃~39℃之间。其
病史询问是医患会话整体结构中的重要组成阶段。本文基于真实医患语料,运用会话分析和统计分析的方法,探讨该阶段医生问题设计的特点、遵循的原则以及问题类型对患者的不同影
本文是作者设计研制发动机进气调节系统的简要总结。从发动机试验建立标准进气的必要性入手,介绍了进气调节系统的设计思想和采取的措施方法,并对系统的应用试验测试结果进行