论文部分内容阅读
2008年以来,中国南方电网公司在广州、深圳供电局率先吹响了创先的号角,通过与国际一流供电企业对标、寻找差距、探索路径,形成了独具特色的创先模式,使广深两局的管理水平和企业实力迅速增强。2009年年初,广东电网公司明确提出通过3至5年的努力,到2011年底,成为国内领先的省级电网公司;到2013年底或者更长一段时间,力争达到国际先进水平。近年来,在创先的引领下,广东电网经受住了金融危机、西南大旱、800千伏楚穗直流投运、台风“灿都”、“凡亚比”等严峻考验,又迎来亚运保电这一艰巨的政治任务。广东电网把亚运保电作为创先工作的总检阅,面对进入倒计时的亚运会,广东电网,你准备好了吗?
Since 2008, the China Southern Power Grid Corporation has been the first to call on the first horns in Guangzhou and Shenzhen Power Supply Bureaus. Through benchmarking, searching for gaps, and exploring routes with world-class power suppliers, a unique pioneering model has been formed. The management level and enterprise strength of Shenzhen and Shenzhen Municipal Bureaus have increased rapidly. In early 2009, Guangdong Power Grid Corporation made it clear that through 3 to 5 years of efforts, by the end of 2011, it will become the leading provincial power grid company in China; by the end of 2013 or a longer period of time, it will strive to reach the international advanced level. In recent years, under the guidance of a pioneer, Guangdong Power Grid has withstood severe challenges such as the financial crisis, drought in the southwest, 800 kV Chu Sui DC, typhoon Chandu, and Fanyabi. It also ushered in the daunting political task of Asian Games to maintain power. Guangdong Power Grid regards the Asian Games power protection as a review of the pioneering work. In the face of the countdown to the Asian Games, Guangdong Power Grid, are you ready?