鞍钢炼铁厂现有高炉10座,其中料车式高炉4座;料罐式高炉6座。料车式高炉装料制度为分装,料罐式高炉装料制度为同装。在1989年由于能源不足,无肥煤炼焦和无焦煤炼焦,致使焦炭质量差,M_(40)日平均最低达57.1%,M_(10)最高达12.7%,焦炭热强度月平均最低28.6%,焦炭灰份大幅度上升;与此同时烧结矿<5mm的粉末平均高达17.9%。因此,1989年先后有3,2,5,6,7,9号高炉炉况失常,其余高炉顺行亦欠佳,全年产量损失达20万吨。在原、燃料条件于短时间内无法改善的情况下,为了扭转这种被动局面,试用了分装小批重的装料制度,取得了较明显的效果。
There are 10 blast furnaces in Anshan Iron and Steel Co., Ltd., including 4 blast furnaces and 6 blast furnaces. Charge car blast furnace loading system for sub-packaging, charging tank-type blast furnace loading system with the same equipment. Due to the lack of energy in 1989, coking coal without coke and coking coal, resulting in poor coke quality, M_ (40) average daily minimum of 57.1%, M_ (10) up to 12.7%, the average monthly minimum coke heat intensity of 28.6% Coke ash increased significantly; at the same time sinter <5mm powder average up to 17.9%. Therefore, in 1989, 3,2,5,6,7,9 blast furnace conditions have been abnormal, the remaining blast furnace along the line is also poor, the annual loss of 200,000 tons of production. In the original, the fuel conditions in a short period of time can not be improved circumstances, in order to reverse this passive situation, try a small batch loading sub-system, achieved more obvious results.