论文部分内容阅读
文章对土坝快速连续高强度施工与质量检查验收占据很长时间之间的尖锐矛盾提出解决方案。
The article puts forward a solution to the sharp contradiction between rapid continuous high-intensity earth dam construction and quality inspection and acceptance takes a long time.