华能九台电厂一期工程2台660 MW超临界燃煤锅炉,是中国自行设计制造,首次采用热工总线布置,同步建设同步投入烟气脱硫装置,具有自主知识产权的亚洲首台最大容量褐煤塔式锅炉,机组热效率比目前的亚临界机组提高约3.61%,比超临界机组平均提高约1.66%。该工程是东北地区电力工业“十一五”规划中的重点电源项目,项目建成后对吉林省中部电网的电压稳定运行起到支撑和巩固作用,同时还对提高东北电网吉黑断面稳定水平、增强东北电网北电南送能力起到至关重要的作用。自机组
Huaneng Jiutai Phase I project 2 sets of 660 MW supercritical coal-fired boiler is designed and manufactured by China itself for the first time using thermal bus layout, simultaneous construction of flue gas desulfurization equipment simultaneously, with independent intellectual property rights of the first largest capacity of lignite in Asia Tower boiler, unit thermal efficiency than the current subcritical unit increased by about 3.61%, than the average increase of supercritical unit of about 1.66%. This project is a key power project in Northeast China’s power industry during the “Eleventh Five-Year Plan”. After the completion of the project, it will play a supporting and consolidating role in stabilizing the voltage in the central power grid in Jilin Province. At the same time, Level, enhance the power transmission capacity of Northeastern China North Power plays a crucial role. Since the crew