京广高铁是中国“四纵四横”高速铁路网络中和京港高速铁路的重要组成部分。作为中国铁路路网中心的郑州铁路局,在京广高铁开通运营中处在非常重要的位置。为此,郑州铁路局机务系统在联调联试期间,对参试人员、方案进行了精心准备,对行车组织进行了全方位的盯控,对可能发生的突发性问题制定了相应措施,确保了京广高铁联调联试顺利完成。
Beijing-Guangzhou high-speed rail is China “four vertical and four horizontal ” high-speed railway network and Beijing-Hong Kong high-speed railway an important part. Zhengzhou Railway Bureau, as the center of China Railway Network, is in a very important position in the opening and operation of Beijing-Guangzhou High-speed Rail. To this end, Zhengzhou Railway Bureau locomotive system during the joint commission test, the participants, the program was carefully prepared for the traffic organization a full range of stubborn control, the possible sudden problems and formulated corresponding measures, To ensure that the Beijing-Guangzhou high-speed rail joint trial successfully completed.