目前,湖南省的机电排灌站进出水钢管,经过十多年、二十年的运行后,管壁锈蚀穿孔而漏气、漏水现象严重,工程效益急剧下降,灌溉成本成倍增加,群众负担大大加重,成为当今机电排灌设备更新改造中的主要问题。据常德市水利部门统计,全市山丘区电灌站因锈蚀穿孔而漏气、漏水的进出水钢管长达20705m,占全市山丘区电灌站进出水钢管总长的39.9%。桃源县架桥乡马儿湾电灌站进出水钢管锈穿漏水后,灌溉面积由500亩下降到200亩,灌溉成本每亩每小时由1.6元上升到5元,群众反映强烈。在
At present, the electromechanical irrigation and drainage pumping stations in Hunan Province have access to the water pipe. After more than 10 years and 20 years of operation, the pipe wall has been corroded and perforated with air leakage. The water leakage is serious, the project benefit is drastically reduced, the irrigation cost is doubled and the masses burden greatly Aggravate, become today’s mechanical and electrical equipment to update the main problems. According to statistics of Changde City Water Conservancy Bureau, the city’s hillock electric pumping station leaks due to rusting and perforation, and the water leakage in and out of the steel pipe reaches 20705m, accounting for 39.9% of the total length of the steel pipe in and out of the electric pumping station in the hillock area of the city. After the steel pipe rust leaking through the Ma’er Bay Electric Irrigation Station in Jiaoqiao Township, Taoyuan County, Taoyuan County, irrigation area dropped from 500 mu to 200 mu. The irrigation cost increased from 1.6 yuan to 5 yuan per mu per hour. The masses responded strongly. in