论文部分内容阅读
12年前,当人们为我国第一座自行设计、制造和施工安装的大型煤炭输出专用码头——秦皇岛港煤一期工程在北方明珠秦皇岛港东港区落成而欢呼时,这座机械化巨龙却没有创造出人们所希冀的辉煌。投产4年,故障走马灯似的轮番出现,车船长时间压港,吞
12 years ago, when people cheered for the completion of the first phase of the Qinhuangdao Port coal project, the first large-scale coal output specialized port designed, manufactured and constructed in China, to be built in the port area of Qinhuangdao Port in the north, the mechanized dragon Did not create the glory people hoped for. Put into operation for 4 years, the fault appears like a turn signal, the long pressure vessel, swallow