In order to increase the availability of the part-time idle bus rapid transit lane(BRT-lane),a time division multiplexing(TDM) method to share BRT-lane with the
Taking the underwater reef blasting in Gulei sea channel of Xiamen Port as an example,the forming characteristic of shock wave in water for underwater drilling