电力,是经济发展的先行官,随着瑞丽经济开发试验区的大步向前发展,瑞丽市工业城市性质、功能及定位已得到进一步明确、强化和提升。随着瑞丽市工业布局的不断调整,原城市边缘区的开发速度对用电的需求快速增长,致使瑞丽片区供电压力日益凸显,110千伏允当变已满载运行多年,电网结构单一,现有电网的布局已难以满足建设发展的用电要求。瑞丽供电局明确了从根本上提升供电可靠性的思路,通过完善电网布局规划,加大电网投资力度,尽快补齐电力短板,促进瑞丽电网的进一步完善,110
Electricity is the forerunner of economic development. With the striding forward of Ruili Economic Development Experimental Zone, the nature, function and positioning of industrial city of Ruili City have been further clarified, strengthened and upgraded. With the constant adjustment of industrial layout in Ruili City, the demand for electricity in the development of the fringe of the original city has been rapidly increasing, resulting in the increasing pressure on the power supply in Ruili Area. The 110-kilovolt transformer has been operating at full capacity for many years with a single grid structure and an existing power grid The layout has been difficult to meet the construction and development of electricity requirements. Ruili Power Supply Bureau made clear the fundamentals to improve the reliability of power supply ideas, improve the layout of power grid planning, increase investment in power grids, as soon as padded power short board, to promote the further improvement of Ruili power grid, 110