在施工过程中,受自然气候的影响,加之工程进度的需要,不可避免的很多工程要在冬季进行施工,如果施工措施不当会对工程产生不利的影响,容易发生工程质量隐患或质量事故。为了确保冬季施工的质量与安全,根据气候的特点工程的实际情况,制定冬季施工的措施,以便有效的控制工程的质量和施工的安全。冬季施工概论所谓冬季施工是指当冬天到来时,如连续五天的日平均气温稳定在5℃以下,则此5d的第一天为进入冬季施工的初日,当气温转暖
During the construction process, due to the influence of natural climate and the progress of the project, many projects that are inevitable must be constructed in winter. Improper construction measures will have an adverse impact on the project and lead to potential project quality problems or quality accidents. In order to ensure the quality and safety of winter construction, according to the actual situation of the project of the climate, the winter construction measures should be formulated in order to effectively control the quality of the project and the construction safety. Introduction to winter construction Winter construction is the so-called winter when the arrival of the day, if the average daily temperature for five consecutive days stable below 5 ℃, then the first day of 5d to enter the winter construction of the first day, when the temperature warmer