论文部分内容阅读
近日,江门市副市长、三防指挥部总指挥邓启明带领市农委、水利局和三防办领导再次检查锦江水库的各项防汛工作,在肯定成绩的同时,要求做到万无一失,确保工程安全度汛。锦江水库在去年遭受超500年一遇的“6·25”特大暴雨洪水的袭击下,库水位达到历史最高97.23m.左坝头山坡发生大面积滑坡,使发电厂房严重受损,生产中断。水库安全与否,引起各级领导和广大干群的普遍关注。从这次检查看,锦江水库在抓紧救灾复产、确保今年春耕用水的同时,针对水库的薄弱环节和工程隐患,采取有效措施,认真落实如下各项工作:
Recently, Deng Qiming, deputy mayor and vice mayor of Jiangmen City, and commander of the Three Defense Commandments led the leaders of the Municipal Agriculture Committee, the Water Resources Bureau and the Third Defense Office to check the flood control work of the Jinjiang Reservoir again. While affirming the achievements, they demanded to be sure of ensuring foolproofness. Project safety flood season. The Jinjiang Reservoir hit a historical high of 97.23m under the “6.25 ” heavy rainfall and flood event hit by the last 500 years last year. Large landslides occurred on the hillside of the Zoba Dam, causing serious damage to power plants and producing Interrupted. Whether the reservoir is safe or not has aroused the widespread concern of leaders at all levels and the majority of cadres. From this inspection, Jinjiang Reservoir, pay close attention to disaster recovery, to ensure that this spring water, at the same time, the weaknesses of the reservoir and engineering risks, to take effective measures to earnestly implement the following: