论文部分内容阅读
本文根据目前某采油厂油矿采出井测试工作的具体情况,针对采出井液面深度测试和示功图测试的工作中存在的道路情况、时率影响、测试操作规范、资料分析和仪器故障等问题,通过加强属地管理、采出井生产管理、测试工作管理和仪器设备管理提出具体问题的解决方案,从而保障测试工作的顺利进行,达到及时准确的上报测试成果,提升低压测试质量,降低工人劳动强度,降低生产成本,为油田开采工作服务。
According to the current situation of oil well production well testing in a oil production plant, the problems of road condition, impact on time rate, test operation specifications, data analysis and equipment failure in the work of deep well test and dynamometer test of production well are analyzed. , And put forward solutions to specific problems by strengthening the management of the territorial management, production well management, testing management and equipment management so as to ensure the smooth progress of the testing work, timely and accurately report the test results, enhance the quality of the low-voltage test and reduce the labor intensity of the workers , Reduce production costs, oil field mining services.