小浪底工程是黄河干流上的一座综合利用的巨型水库。坝址位于三门峡下游13n 公里。拦河坝为粘土斜心培土石坝,大坝全长1500米,坝高152米,填筑工程量为5687:万立方米,总库容127亿立方米,有6$直径为N.5米的导流泄洪洞;总装机容量 156万千瓦。黄河水利委员会勘测规划设计院曾于1983年9月完成该工程的初步设计报告及总概算。1985年1~10月与美国柏克德土木与矿业公司联合重新编制初步设计及概算。中美联合设计的概算采.用了“柏克德公司方式”,没有沿用国内已有的方法、定
Xiaolangdi Project is a comprehensive utilization of a giant reservoir on the mainstream of the Yellow River. The dam site is located 13n kilometers downstream of Sanmenxia. The barrage is a clay and earth-dam earthen dam with a total length of 1,500 meters, a dam height of 152 meters, a project volume of 587,700,000 cubic meters, a total storage capacity of 12.7 billion cubic meters, and a 6 dollar N.5 meter diameter guide. Flood hole; total installed capacity of 1.56 million kilowatts. The Yellow River Conservancy Commission Survey, Planning, and Design Institute completed the preliminary design report and general budget estimate of the project in September 1983. From January to October 1985, the preliminary design and estimate were jointly prepared with Becket Earth and Mining Company. The joint calculation of the Sino-U.S. design uses the “Beckert company approach”, which does not follow the existing domestic methods.