论文部分内容阅读
鲁布革电厂是我国引进外资建设的水电站,其主要设备都是具有80年代先进水平的,计算机监控系统是向德国西门子公司引进的,但是,为了实现一流水电站的目的及随着电网的发展,原 R30计算机已显落后。
Lubuge power plant is the construction of hydropower station in our country to introduce foreign investment, the main equipment is the advanced level of the 80s, computer monitoring system is introduced to the German company Siemens, but, in order to achieve the goal of first-class hydropower stations and with the development of the power grid, The original R30 computer has lagged behind.