论文部分内容阅读
金莱塞德坝的水电潜力一直未得到开发,直到2002年2月,这种状况得以改变。经过34a的努力,新增装机容量185MW的阿罗湖发电站,开始投入商业运行。
The hydropower potential of the Golden Lester Dam has not been developed until February 2002, and the situation has changed. After 34 years of hard work, the newly-added Aerohuo Power Station with an installed capacity of 185MW was put into commercial operation.